| Project Portfolio |
|
Please peruse this partial list of projects completed by Double Diamond Masonry over the years and feel free to contact any of the listed General Contractors. As you will note, the list reflects our ability to accomplish any masonry project, large or small, from the finest detail in fireplace and stone veneers to the technical structural aspects of any commercial project in CMU or brick. Project: Jetton Residence (1999) General Contractor: Ross Alexander Construction (541) 382-8433 Masonry Subcontract: $17,000 Description: Sandlewood Tuff stone veneers, Masonry Fireplace Project Masonry Supervisor: Dan Ward Project: Lahaina Gallery (Building 300a, Old Mill Shops 2000) General Contractor: Keeton King Construction (541) 923-0704 Masonry Subcontract: $145,000 Description: Brick Veneer Project Masonry Supervisor: Dan Ward Project: Lifewise Building (2001) General Contractor: Keeton King Construction (541) 923-0704 Masonry Subcontract: $280,000 Description: Structural Brick Project Masonry Supervisor: Dan Ward Project: Hollywood Video Redmond (2001) General Contractor: Kirby Nagelhout Construction (541) 389-7119 Masonry Subcontract: $66,000 Description: Structural CMU, patterned split face Project Masonry Supervisor: Dan Ward Project: Safeway #1960 Madras (2001) General Contractor: James E. John Construction (360) 696-0837 Masonry Subcontract: $194,000 Description: Structural CMU Project Masonry Supervisor: Dan Ward Project: Tomlinson Residence (2002-03) General Contractor: Ross Alexander Construction (541) 382-8433 Masonry Subcontract: $141,000 Description: Masonry Fireplaces, Retaining walls, Montana Mossy stone veneers Project Masonry Supervisor: Dan Ward Project: North Rim Lodge and Park (2003-04, 2007) General Contractor: Wilcox Construction (541) 480-7035 Masonry Subcontract: (2) combined total c. $900,000 Description: Structural Masonry, Structural Masonry fireplaces, Montana Mossy stone veneers, retaining walls, slate flooring and patios, garden walls. The centerpiece of North Rim Development, we worked closely with the Architect, project manager and Wilcox to achieve the exact look and feel that the project required. From setting the foundation to finishing the floors, we were on the job daily from ground breaking to opening day, approximately 9 months. Project Masonry Supervisor: Dan Ward (Lodge), Chris Robinson (Park) Project: Brasada Ranch Core Facilities (2004-present) General Contractor: Keeton King Construction (541) 923-0704 Masonry Subcontract: Multiple, totaling approximately $1.8 M Description: Structural CMU, Masonry fireplaces, Garden walls, slate flooring, concrete paving stones, Mossy lava veneers, Boulder work. Project Masonry Supervisor: Paul Maseline Project: St. Charles Medical Center Redmond Campus (2005-2006) General Contractor: Skanska USA (541) 504-9525 Masonry Subcontract: $487,000 Description: CMU Veneers, Structural CMU, Montana Mossy Stone Veneers, Precast Concrete Slabs. Stone walls and Pre Cast concrete panels to > 50’ above ground. Project Masonry Supervisor: Chris Moulton Project: Bend Memorial Clinic Westside (2006-2007) General Contractor: R&H Construction (541) 312-2961 Masonry Subcontract: $124,000 Description: Brick Veneer over steel stud, CMU elevator shaft Project Masonry Supervisor: Chris Moulton, Paul Maseline Project: Borden’s Corner, Bend East Side (2006-07) General Contractor: R & H Construction (541 312-2961 Masonry Subcontract: $183,000 Description: Brick Veneer over existing tilt-up building, and brick veneer over new Stud construction Project Masonry Supervisor: Chris Moulton Project: Aspen Lakes Clubhouse (2007) General Contractor: Keeton King Construction (541) 923-0704 Masonry Subcontract: $19,000 Description: Tumbled Bitterroot Ledge Stone Fireplace Project Masonry Supervisor: Chris Moulton Project: Trader Joes Bend (2007) General Contractor: SD Deacon Corp. (503) 297-8791 Masonry Subcontract: $244,000 Description: Structural CMU, Manufactured Stone Veneers Project Masonry Supervisor: Chris Robinson Project: Baney Corp. Headquarters (2007-present) General Contractor: Degree Construction (541) 389-2752 Masonry Subcontract: $216,000 Description: Brick Veneer over steel stud, CMU elevator shaft. Project Masonry Supervisor: Chris Moulton Project: Rainey Residence (2007-present)
General Contractor: Ross Alexander Construction (541) 382-8433 Masonry Subcontract: $146,000 Description: Masonry Fireplace, Stone Veneers Project Masonry Supervisor: Chris Robinson |
Phone: (541) 388-2691
Fax: (541) 388-2696
Download our application and mail or
fax it to us.